Off/Grid

Europe · grid-independent compute

Build the datacenter
before the grid arrives.

A grid connection in Europe takes seven to ten years. We simulate seventeen candidate sites hour by hour across a full meteorological year and answer one question: can wind, solar and storage alone hold the load?

17
candidate sites
8 760
hourly points / site
3
IT loads simulated
1 %
viability threshold
The premise

Loss-of-load probability is the only honest metric.

01

Interconnection is the bottleneck

Compute demand moves in eighteen-month cycles. Transmission moves in decades. Off-grid siting decouples the two.

02

Weather decides, not nameplate

A 300 MWp array in Seville and one in Kiruna are different machines. Only hourly reanalysis exposes the difference.

03

One number, three verdicts

LOLP under 1 % supports AI training. Under 0.1 % approaches continuous service. Above 10 % the site cannot power itself.

The sites

Seventeen locations, ranked by the hardest test we run.

Each row shows two numbers. LOLP · ref build is the share of the year the site cannot power a 50 MW compute load, even with the largest sizing we simulate. CAPEX ≤ 1 % is the cheapest build that keeps outages under 1 % of the year — a dash means no sizing in the grid gets there.

SiteLOLP · ref build
  • Loading site index…

Open the instrument.

Rotate the globe, hover a site, dial turbines, solar and storage — and watch the loss-of-load probability move in real time.

Launch instrument