Four equations decide whether a site can power itself.
Every site is simulated hour by hour over a full ERA5 meteorological year. No capacity factors, no annual averages — the battery either holds through the January calm or it does not.
Every number in this tool comes from one deterministic simulation: 8 760 hourly points of ERA5 reanalysis per site, converted into power, integrated through a battery, and reduced to a single probability. No stochastics, no fitted models.
Wind
Ten-metre reanalysis wind is extrapolated to the 100 m hub with a power-law boundary layer, exponent 0.14 for open terrain.
Air density follows the ideal gas law, so cold sites extract more power from the same wind speed.
Rotor power is the kinetic flux through a 150 m disc with a real power coefficient of 0.45 — below the Betz limit of 0.593 — clipped at the 6 MW rating and zeroed outside cut-in 3 m/s and cut-out 25 m/s.
Solar
Global horizontal irradiance scales linearly against 1 000 W/m², derated by cell temperature: the module runs 0.03 K hotter per W/m² of irradiance and loses 0.4 % of its yield per kelvin above 25 °C.
Cooling and PUE
All IT power becomes heat. The chiller is modelled as a Carnot machine with 50 % isentropic efficiency, evaporating at 15 °C and condensing 10 K above ambient — so the PUE is a function of local temperature, not a constant.
Below 15 °C ambient the site switches to free cooling and the PUE is fixed at 1.10. This is why the Nordic sites carry a structural advantage.
Battery
The power balance is integrated with explicit Euler over 8 760 one-hour steps, starting at half charge, with a 90 % round-trip efficiency and hard bounds at zero and rated capacity. Surplus beyond full charge is curtailed.
Loss of load probability
An hour counts as a deficit whenever demand exceeds production plus the energy the battery can actually deliver. LOLP is simply the share of such hours in the year — the one number the whole product turns on.
Sizing search
For each site and IT load the grid is swept exhaustively, and the cheapest configuration meeting the LOLP threshold is retained, at €8 M per 6 MW turbine, €0.7 M per MWp of solar and €0.25 M per MWh of storage.
Data source
Open-Meteo / ERA5 reanalysis, calendar year 2023, 8760 hourly points per site: 100 m wind speed, global irradiance and 2 m temperature.
Search space
A precomputed grid over turbine count, PV capacity and battery energy, evaluated for three IT loads — 10, 25 and 50 MW.
Output
Loss-of-load probability, deficit hours and CAPEX for every combination, plus the cheapest sizing that meets each LOLP threshold.