A siting instrument, not a spreadsheet.

Compute capacity is being planned on eighteen-month horizons while transmission upgrades are planned on decade horizons. The gap is now the binding constraint on European datacenter development.

Skipping the interconnection queue means accepting a physical truth: the site must carry its own load through the worst week of the year. This tool makes that week visible — the state of charge falling, the deficit hours accumulating, the sizing needed to prevent it.

It is deliberately narrow. It does not price power purchase agreements, model curtailment revenue, or evaluate permitting risk. It answers one question with one number.

What it covers

Hourly wind, solar and thermal conditions; a Betz-limited turbine model with shear and air-density correction; temperature-derated PV; a cooling model whose PUE tracks ambient temperature; and a round-trip-efficiency battery integrated hour by hour.

What it assumes

A constant IT load, a single meteorological year, no grid import, no diesel backup, and perfect foresight-free dispatch — charge when there is surplus, discharge when there is deficit.

Where it is weakest

One year of reanalysis is not a climate distribution. A site that clears 1 % in 2023 may not clear it in a poor wind year. Treat rankings as robust and absolute values as indicative.